Inactivity on the Community plan

On the free Community plan, a team stays connected as long as someone uses it. If nobody has used a team for 60 days, we ask the grid operator to disconnect its metering points. The team owner gets an email at least 14 days beforehand, and opening the team once is enough to keep the metering points connected.

Paid plans have no such rule, and neither does a team during its trial.

What counts as use

Any of these resets the 60 days:

  • a member opens the team on energiedaten.at, for example with the Open the team button in the warning email
  • one of the team's API keys is used
  • a connected app, such as an AI assistant linked to the team, retrieves data

For a new team, the 60 days start on the day the team was created.

The warning email

At least 14 days before the disconnection, the team owner gets an email with the date on which we will disconnect the metering points. If someone opens the team or uses the API before that date, the metering points stay connected and the 60 days start again.

What disconnecting means

On that date, we send the grid operator a revocation for every connected metering point of the team, the same message the Disconnect button on the metering point page sends. The metering point shows "Disconnect pending" until the grid operator confirms, then "Consent ended". After that, the metering point receives no new data.

The team owner gets one email that lists the metering points. The metering points stay in your account, and the data collected so far stays for as long as your plan's data retention allows. Integration test meters are not affected.

If the team then has no connected metering point and no open connection request, we delete it with its data after a further 60 days, and the owner gets a warning email 14 days before. If it is the owner's only team, their user account is deleted with it; they can sign up again at any time. To keep the team, connect a metering point or request a connection before then; opening the team alone does not stop the deletion.

Reconnecting a metering point

Open the metering point and click Connect. This starts a new consent process: the contract holder confirms the request with the grid operator, and data arrives again once the grid operator has approved it.

If the team should stay connected without regular use, a paid plan does that.